Candradimuka Prospect Area
Central Java Candradimuka Area, a segment of WKP Dieng, is a focal point for development alongside Dieng Field and the Mangunan-Wanayasa Prospect Area. The development initiative commenced in December 2016 with a target Commercial Operation Date (COD) set for 2023. The geothermal potential is estimated at 54.5 MWe (P50), and GDE envisions a development plan of 45 MWe, including a primary condensing geothermal power plant of 2 x 20 MWe and a binary geothermal power plant of 5 MWe. Positioned as a pilot project for the Infrastructure Sector Geothermal Funding (PISP), managed by PT SMI, it serves as a strategic move to accelerate geothermal development in Indonesia.